Who issues the permit in Newton County?
The Newton County Floodplain Administrator.
Floodplain Office, 509 Main St, Newton, TX 75966. 409-379-2169. Mailing address: P.O. Box 372, Newton, TX 75966. Call for an appointment.
The application notes that septic permits may be needed from the Jasper-Newton Public Health District (409-384-6829 ext. 247), and some sites may need US Army Corps of Engineers permits.
Is a permit needed for every home?
Yes. Newton County says all new development needs a floodplain development application processed before construction starts, and lists manufactured homes, tiny homes, portable buildings, new construction, subdivisions and RV parks. The process decides what else the site location requires.
What are the fees?
| Item | Fee |
|---|---|
| Floodplain development permit | $40, issued on payment once requirements are met |
| Letter of zone determination only | $20 |
The permit is valid for six months from issue. No work of any kind may start until it is signed and issued.
What does the application need?
- the owner and site details, with latitude and longitude to five decimal places
- the project type: manufactured home on private property or in a park, plus any well, septic, driveway, culvert, clearing or fill
- a site development plan, required for all new development, showing roads, creeks, the construction site and the proposed height of the new structure
- an elevation certificate, required for all new development
- in a regulatory floodway, a no-rise certification from a registered engineer if requested
What does the state require in Newton County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Newton County requires a site development plan for every new home, showing roads, creeks, the home site and the home’s height. Add the septic system, any well, the driveway and culvert, and the property lines. Stampd draws site plans for manufactured home placements.