Who issues the permit in Cass County?
For septic systems, not the county. The Northeast Texas Municipal Water District (NETMWD) is TCEQ’s designated representative for on-site sewage facilities in Upshur, Morris, Marion and Cass counties.
NETMWD, 903-639-7538.
NETMWD says anyone building a structure that uses water-using devices, or repairing or replacing a septic system, must first submit a completed permit application and the fee to the district. A manufactured home with plumbing on its own septic system falls under that.
Other approvals, such as floodplain, address and driveway, are separate. Check the parcel’s flood zone and whether it is inside Linden, Atlanta or another city before ordering anything.
What are the septic fees?
| Permit | NETMWD fee (effective October 1, 2023) |
|---|---|
| Single-family residence | $360 |
| Multi-family or commercial | $610 |
Texas also charges a separate $10 state fee on each on-site sewage permit.
What does the state require in Cass County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design depends on where the home, the system and its field, any well and the property lines sit, so show them with distances. Mark any part of the lot in a mapped flood zone. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.