Who issues the permit in Harris County?
It depends on where the property sits, so start from the parcel, not the mailing address.
| Where the property is | Who handles placement | Notes |
|---|---|---|
| Unincorporated Harris County | Harris County Office of the County Engineer | Residential development, septic (OSSF), floodplain, driveway and fill approvals |
| Inside the City of Houston, in a licensed manufactured home park | Houston Public Works, Structural Inspections | Manufactured Home Placement Permit |
| Inside another city (for example Pasadena, Baytown or Tomball) | That city | Each city publishes its own requirements |
A Houston mailing address does not mean the property is inside Houston city limits. Check the parcel with the county’s address lookup before you prepare anything.
What does unincorporated Harris County require?
Harris County says a permit is needed for all development in the county, and defines development broadly: buildings, filling, grading, paving and storing materials all count. The residential application covers new homes, septic systems, driveways, fill and accessory structures on existing lots.
Applications go through the county’s E-Permits system. You pick the property on a map, choose the application type and upload the documents. Choosing the wrong application type is the delay the county itself warns about.
| Approval | When it applies | What the county asks for |
|---|---|---|
| Residential development | Every placement | Completed residential application and an accurate site plan |
| Septic (OSSF) | No public sewer | The full OSSF checklist below, with plans drawn to scale |
| Floodplain development | Property in a mapped floodplain | Elevation certificate, or engineer-stamped drawings in the 100-year floodplain |
| Driveway | Crossing the county right-of-way or a roadside ditch | Residential application and a detailed site plan |
| Fill | Bringing in dirt | Residential application, site plan and a fill affidavit |
| Private water well | Drilling a well in unincorporated Harris County | A county approval letter, unless an exception applies (for example a parcel of 10 acres or more) |
A permit is void if work does not start within 180 days of issue. Two six-month extensions can be requested in writing before it expires.
What is on the septic (OSSF) checklist?
The county’s Onsite Sewage Facility plan submittal checklist lists:
- a septic application with a valid address and HCAD property tax number
- an Affidavit to the Public, filed and recorded with the Harris County Clerk’s Office
- an acknowledgement of testing requirements form
- a site evaluation report by a professional engineer or registered site evaluator
- a property survey, if the lot is not in a recorded subdivision
- a septic design site plan
- a technical report and a system flow diagram
- a joinder affidavit if the system crosses property lines
- a maintenance contract with a licensed maintenance provider
Plans must be drawn to scale. Once fees are paid, the county issues an Authorization to Construct. Only the licensed installer may call in inspections, with at least 24 hours’ notice, and an inspection can only be booked with a valid permit and the plans stamped by the county permit office.
What changes if the property is in the floodplain?
Harris County compares the lowest adjacent grade (LAG) with the base flood elevation (BFE) to decide how the application is treated:
- LAG at or above the BFE: processed as outside the 100-year floodplain.
- LAG below the BFE: processed as inside the 100-year floodplain.
- 500-year (shaded X) zone: an elevation certificate is needed with the development application and an accurate site plan.
- 100-year floodplain or floodway: drawings by a Texas-licensed architect or engineer, and a site plan stamped by a Texas professional engineer with the Harris County floodplain notes, a benchmark description, the address and legal description, and the base flood and finished floor elevations.
Check the parcel on the county’s map before ordering the site plan, because the floodplain status decides who has to draw it and what it must show.
What does the City of Houston require?
Inside Houston, the Manufactured Home Placement Permit applies when a home is first placed in a space inside a licensed manufactured home park.
| Item | City of Houston |
|---|---|
| Fee | $80.56, plus a $33.56 admin fee. Re-inspections are $33.56 |
| Form | Application for Placement Permit of Manufactured Home (CE-1230) |
| Information needed | Placement address, size, year, cost, serial number, make and model, dealer and installer |
| Plan review | Not required |
| Inspection | Placement inspection of the tie-downs, the lot and spacing from surrounding homes |
| Valid for | Six months |
| Where | In person at 1002 Washington Avenue, 4th Floor, Houston. Manufactured homes section: 832-394-8842 |
After the placement inspection passes, the electrical, plumbing and mechanical contractors buy their own permits, and utilities are released once all final inspections pass.
What does the state require in Harris County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Every Harris County approval above asks for an accurate site plan, and the floodplain and septic reviews ask for more detail than a sketch. At minimum, expect to show the property lines, the exact home placement, existing and proposed structures, the driveway and any right-of-way crossing, and, where they apply, the septic system and the floodplain boundary. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.