Who issues the permit in Navarro County?
For property outside city limits, Navarro County Planning & Development issues the development permit, the 911 address, septic permits and floodplain permits.
Planning & Development, 601 N. 13th St., Suite 1, Corsicana, TX 75110. 903-875-3311. Open 8:00 am to 4:30 pm, Monday to Friday, closed 12 to 1.
| Where the property is | What applies |
|---|---|
| Unincorporated, outside the Richland-Chambers Lake zoning area | Development Permit / 911 Address Request |
| Within 5,000 feet of Richland-Chambers Lake | Lakeshore zoning ordinance and the lake area residential building permit checklist |
| Inside a city, such as Corsicana | That city’s permits and addressing |
What does the development permit need?
The county’s Development Permit / 911 Address Request has a box for a new or used manufactured home with its dimensions. Submit:
- the completed application, all parts. Missing items delay the permit
- proof of ownership: a copy of the warranty deed or contract
- a survey, or the form’s “draw a map” page, showing the home, the driveway marked with an X, the closest intersection, and the nearest neighbors with their house numbers
- a signed acknowledgement that all septic systems need a permit, that driveways and culverts on county right-of-way need an access permit, and that development in a floodplain needs a floodplain permit
- for a manufactured home, the appraisal district page: manufacturer, date of manufacture, serial number, length (without the tongue), width, color and a photograph of the home
- the fee, by cash, check or money order
New addresses take about 7 to 10 business days. Addresses follow the primary driveway, so moving the driveway means a new address. A driveway onto a state road needs TxDOT approval, and a property reached across someone else’s land needs a copy of the recorded easement shown on the survey.
What are the fees?
From the county’s fee schedule effective May 26, 2026:
| Permit | Fee |
|---|---|
| Development permit (outside the lake zoning area) | $300 |
| Septic (OSSF), single-family residence | $600 |
| Septic re-inspection | Half the original fee |
| Lake area development permit | $0.50 per sq ft of structural area |
| Temporary use permit (RV) | $300 |
All fees double if construction begins before permits are issued.
How does the septic permit work?
All septic systems in Navarro County need a permit and a licensed installer, with a possible fine of $500 per day for violations.
- Get the application from Planning & Development.
- A soil and site evaluation sets the size and type of system. Class 4 soils need a non-standard system, with a minimum lot size of 1 acre.
- Planning materials are prepared. Proprietary and non-standard systems need a registered sanitarian or professional engineer.
- Submit the application with a verified 911 address, the planning materials, the site and soil evaluation, accurate directions to the site and the fee.
- Mailed applications are reviewed within 30 working days. In-office reviews are by appointment.
- On approval, an Authorization to Construct is issued. It can last up to a year, but only 30 days if a habitable structure is already on the property.
- The system is inspected before it is covered, then a Notice of Approval is issued.
Aerobic systems need a continuous service policy for the first two years.
What does the state require in Navarro County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Navarro County accepts a survey or a hand-drawn map for the address, but the septic design, the driveway access permit and any floodplain permit all depend on where the home, the system and the driveway sit on the lot. A site plan showing the home, the driveway, the septic system, the property lines and any flood zone serves all of them. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.