Bastrop County, Texas

Manufactured home permits in Bastrop County, Texas

Sources last checked

Bastrop County does not issue building permits, but a manufactured home outside city limits still needs a development permit from Bastrop County Development Services. Where there is no public sewer, the septic (OSSF) application is filed at the same time. Every application needs proof of ownership, a dimensioned site plan and a survey or plat, uploaded through MyGovernmentOnline.

manufactured homes installed in Bastrop County in 2025 (TDHCA installation records)
508
for a Bastrop County development permit to be completed before it expires
3 years
before a septic (OSSF) permit expires, with no extensions
1 year
Get a quote for Bastrop County For dealers and installers

Who issues the permit in Bastrop County?

For land outside city limits, Bastrop County Development Services issues a development permit.

Development Services, 211 Jackson Street, Bastrop, TX 78602. 512-581-7176.

Bastrop County does not issue building permits or certificates of occupancy. That does not mean no permit: external development needs a development permit, and the septic (OSSF) permit is part of the same submission where there is no public sewer.

The cities of Bastrop, Elgin and Smithville have their own zoning. A property inside one of them follows that city’s rules, not the county’s.

What does every application need?

Item What Bastrop County asks for
Proof of ownership Always
Site plan Dimensioned, showing the proposed improvements and the existing buildings or structures
Survey or plat A copy, always
Septic (OSSF) application Filed at the same time as the development application where public wastewater is not available, with floor plans
Owner’s agent certificate When someone other than the owner applies
More The county may ask for more information as needed

Applications and supporting documents are uploaded through MyGovernmentOnline, where you can also message Development Services staff. The county recommends contacting the office before submitting, because requirements can change without notice.

The county’s forms page also lists a work in right-of-way application, a temporary driveway application, residential driveway requirements, an address sign order form, and affidavits for aerobic septic systems and for a septic system on multiple lots.

How long do Bastrop County permits last?

Permit Expiry Extension
Development permit Valid when issued; expires if construction is not completed within three years One-time 180-day extension, requested 30 days before expiry. The same extension applies to driveway permits
Septic (OSSF) permit One year after the Authorization to Construct, or one year after the first site inspection if no Authorization was issued None

What other rules apply?

  • Non-compliant property. Permits are not issued for non-compliant property unless there is a health or public safety reason, such as a failed septic system, approved by the department head.
  • Bedroom additions. An addition with bedrooms needs septic review. If a revised septic design is needed, the development permit waits for the revised OSSF application.
  • Pine Forest subdivisions. Single-family development there also needs pre- and post-development drainage maps signed and sealed by a registered professional engineer.
  • Floodplain. Bastrop County has a Flood Damage Prevention Order and publishes guidance for shaded Zone X. Check the parcel on the county’s Development Services map viewer before ordering a site plan.
  • Deed restrictions. The county does not place or interpret deed or property restrictions; that is for the owner to research.

What does the state require in Bastrop County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Bastrop County asks for a dimensioned site plan with the proposed home and every existing building or structure, filed with the survey or plat. Where there is a septic system, the OSSF review also depends on where the home, the system and the property lines sit, so show them with distances. Stampd draws site plans for manufactured home placements to the county’s checklist.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does Bastrop County require a permit for a manufactured home?

Yes. Bastrop County says it does not issue building permits or certificates of occupancy, but external development needs a development permit from Bastrop County Development Services, 211 Jackson Street, Bastrop, TX 78602 (512-581-7176). Where public wastewater is not available, a septic (OSSF) permit application is submitted at the same time.

What does every Bastrop County development application need?

At a minimum: proof of property ownership, a dimensioned site plan showing the proposed improvements and existing buildings or structures, and a copy of the survey or plat. The county says more information may be requested. Applications and documents are uploaded through MyGovernmentOnline.

How long is a Bastrop County development permit valid?

It becomes valid when issued and expires if construction is not completed within three years. A one-time 180-day extension of a development or driveway permit can be granted if requested 30 days before expiry. Septic (OSSF) permits expire one year after the Authorization to Construct is issued, and they cannot be extended.

Do the cities in Bastrop County follow county rules?

No. The cities of Bastrop, Elgin and Smithville have their own zoning, and property inside a city follows that city's rules. County rules apply to unincorporated land.

Are floor plans needed for a Bastrop County septic permit?

Yes. Bastrop County asks for floor plans with OSSF permit applications. An addition with bedrooms needs septic review, and if a revised septic design is required the development permit is not issued until the revised OSSF application is made.

Will Bastrop County issue a permit on a non-compliant property?

Generally no. The county says permits will not be issued for non-compliant property unless there is a health or public safety reason, such as a failed septic system, approved by the department head.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Bastrop County, Development Services
  2. Bastrop County, Development Services application fees (adopted June 20, 2025)
  3. TDHCA, Manufactured Housing installation records Installations reported in Bastrop County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077