Who issues the permit in Montgomery County?
For property outside city limits, the Montgomery County Permit Department issues a residential development permit.
Permit Department, 501 North Thompson, Suite 100, Conroe, TX 77301. 936-539-7836. Open 8:00 am to 3:00 pm, Monday to Friday.
The county says the development permit exists to make sure its floodplain management rules and FEMA requirements are met. A property inside a city, such as Conroe, follows that city’s rules, and the county warns that other documents may be required for property in a city’s jurisdiction.
What is on the Montgomery County checklist?
The county rejects incomplete applications, so bring everything at once.
| Document | When | What the county says |
|---|---|---|
| Development Permit Application - Residential | Always | List any grading, clearing, fill or disturbed area in the detailed description, or it is not covered. Double-check the electric company: the county sends the permit number to it the day the home is permitted |
| Stormwater Management Compliance Certificate | Always | If a Stormwater Maintenance Declaration applies, file it with the County Clerk and give the document number |
| Water and sewer letter | Public utilities | On utility district letterhead, dated within the past year, stating water and sewer will be provided to the specific address. “Capacity” letters are rejected. Two letters if there are two providers |
| Septic permit | No public sewer | A separate septic application. Existing systems need their maintenance contract and latest inspection report |
| Legal description | Always | Subdivision, section, block and lot, or a metes and bounds description or survey |
| Site plan or survey | Always | See below |
| Drainage sign-off | More than 15,000 sq ft disturbed, 500 cubic yards of fill or excavation, or a retaining wall 3 ft or higher | From the county Engineering Department |
| Floodplain documents | Within 100 ft of the floodplain or floodway | Elevation certificates and conformity forms for each structure |
| Precinct 4 culvert form | Where it applies | Culvert verification form or culvert inspection receipt |
| Form 101 | City of Houston planning area | Certificate of Compliance or Development Approval Form. Recorded subdivisions with no changes are excluded |
| SJRA permit | Within 2,075 ft of Lake Conroe | Required as proof of sewer |
Documents must be printed on 8.5 x 11 white paper, single-sided. Each permit fee is paid separately, by exact check or money order payable to Montgomery County.
What does the site plan have to show?
Montgomery County is specific, and it is the most common reason a submission comes back. The site plan or survey must:
- show the entire property. Cropped or zoomed-in plans are not accepted
- show all lot boundaries and the exact location of the proposed home
- show all existing and proposed structures
- show the septic system with its spray or drip field, and any well
- show the disturbed area for any grading, clearing or fill
- mark the floodplain boundaries (a printed floodplain map can be used)
Stampd draws site plans for manufactured home placements to this checklist.
What timing rules apply?
- Start of construction is placing the home (or pouring a slab).
- If construction does not start within 180 days, the county requires a non-structure permit for the site work, and the structure permit is applied for when the home is ready to be placed.
- Once work starts, the permit stays valid only while work continues actively until completion.
- Permit details, including the address, cannot be changed after the permit is generated. A new permit has to be purchased.
- Each livable structure needs its own address. Request or verify it at mc911.org before applying.
What does the state require in Montgomery County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.