Who issues the permit in Rains County?
| What | Office | Phone |
|---|---|---|
| Septic (OSSF) permits | Rains County Environmental Enforcement, 189 E. North St., Emory, TX 75440 | 903-473-5025 |
| Driveway and culvert permits | Rains County Road and Bridge, county inspector | 903-473-5099 |
The permits page says septic applications and fees go to the County Clerk’s office.
What are the septic rules?
Rains County adopted rules stricter than the state minimum:
- A permit and inspection are required for every system, regardless of tract size.
- Only licensed installers may build or repair a system; no homeowner installs unless licensed.
- Lot minimums: 1 acre of usable space with public water, or 1.5 acres with a private well.
- Subdivisions platted after the order need lots of at least 1 acre.
- Every habitable structure must connect to a sewer or an approved septic system.
What does the septic application need?
Submit one original of each, in the property owner’s name:
- the application
- the site evaluation by a site evaluator, registered sanitarian or engineer
- the technical information sheet
- the complete system design, sealed by a registered sanitarian or engineer, with a report on the basis of design and sizing
- the acknowledgement of maintenance and water conservation practices
| Fee | Amount |
|---|---|
| Single-family residence | $400 |
| Commercial, institutional or multifamily | $600 |
After approval, an authorization to construct is issued. Book the inspection one working day ahead, before the system is covered.
Driveways and culverts
- Stake the driveway location and submit the driveway/culvert permit application.
- The county inspector sizes and recommends the culvert.
- Install it to the county’s guidelines and call the inspector (903-473-5099).
The permit must be completed within six months. The current policy charges no permit fee; extra inspections to fix defects are $25 each.
What does the state require in Rains County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Rains County’s septic design needs a scaled site plan with the boundary, all buildings, the system, setbacks, wells, easements, steep slopes and nearby water, which is common near Lake Tawakoni. The lot minimum counts usable space. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.