Hidalgo County, Texas

Manufactured home permits in Hidalgo County, Texas

Sources last checked

In unincorporated Hidalgo County, a manufactured home moved onto a lot needs a residential development permit from the Hidalgo County Planning Department in Edinburg. The application includes a signed and notarized deed and a site plan with lot and home dimensions and setbacks. Water and electric service are released only after the permit, an approved setback inspection and Health Department approval.

manufactured homes installed in Hidalgo County in 2025 (TDHCA installation records)
393
Hidalgo County residential development permit; utility certificates are $60 and a flood zone area adds $200
$200
Planning Department offices: Edinburg, Weslaco and Mission
3
Get a quote for Hidalgo County For dealers and installers

Who issues the permit in Hidalgo County?

For property outside city limits, the Hidalgo County Planning Department issues residential development permits and the water and light (utility) certificates.

Office Address Phone
Main office 2818 S. Business Hwy 281, Edinburg, TX 78539 956-318-2840
Precinct 1 substation 1902 Joe Stephens Ave, Weslaco, TX 78596 956-968-4734
Precinct 3 substation 2401 Moorefield Rd, Mission, TX 78574 956-205-7045

Hours at the main office are 8:00 am to 5:00 pm, Monday to Friday. The county also offers permit appointments.

The Planning Department’s FAQ lists move-in structures, including manufactured homes, among the things that need a residential development permit. A property inside McAllen, Edinburg, Mission, Pharr or another city follows that city’s rules.

What does the development application need?

From the county’s requirements sheet:

Item What Hidalgo County asks for
Deed A copy of the deed to the property, signed and notarized
Measurements Exact measurements of the lot and the home
Application, page 1 Items 1 to 9 filled out
Application, page 2 A site plan sketch: lot dimensions, home dimensions, distance from the property line to the home, and the name of the road fronting the property
Application, page 3 Read the notice and sign
Setbacks The home must meet the required setbacks. The recorded subdivision plat shows them

A floodplain development permit application is added where the property is in a flood zone.

How do water and electricity get connected?

Hidalgo County releases utilities through a utility certificate, and the application for it is given to you after the development permit is issued.

  • You need an approved development permit and an approved setback inspection first.
  • Every residential utility clearance needs Hidalgo County Health Department approval.
  • Septic: the tank has to be installed, and the county’s OSSF department signs the utility clearance from a copy of the septic tank report.
  • Sanitary sewer: the OSSF department provides the verification approval.
  • Electric: Magic Valley Electric customers apply at its office for an account number; AEP customers call for the 17-digit ESI number.
  • A water-only clearance is for vacant land with no structures on it.

What are the fees?

Item Fee
Residential permit $200
Utility certificates, reconnections and affidavits $60
Flood zone area $200
Re-inspection $35 each
Penalty for work done without a permit (where it otherwise complies) $100

From the Planning Department fee schedule effective January 1, 2025.

What other rules apply?

  • No RVs as homes. Since January 1, 2025, the county no longer grants development permits or utility clearances for travel trailers, RVs or motor homes used as primary residences.
  • Same footprint, no permit. A development permit is not required if a structure keeps its original square footage.
  • Inspections. The county says most permits require an inspection.

What does the state require in Hidalgo County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Hidalgo County’s sketch asks for the lot dimensions, the home’s dimensions, the distance from each property line to the home and the name of the fronting road, and the setback inspection checks the home against the plat setbacks. A measured site plan that shows the recorded setbacks avoids a failed inspection that holds up the utility certificate. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Hidalgo County, Texas?

Yes, outside city limits. The Hidalgo County Planning Department says move-in structures, including manufactured homes, need a residential development permit. Its main office is at 2818 S. Business Hwy 281, Edinburg, TX 78539 (956-318-2840), with substations in Weslaco (956-968-4734) and Mission (956-205-7045).

What do I need to apply for a Hidalgo County residential development permit?

A copy of the deed to the property, signed and notarized; exact measurements of the lot and the home; and the county's Chapter 232 development application, which includes a site plan sketch with the lot dimensions, the home's dimensions, the distance from the property line to the home, and the name of the road fronting the property. The home must meet the required setbacks.

How do I get water and electricity connected in unincorporated Hidalgo County?

Utility clearances need an approved development permit for the structure and an approved setback inspection, and every utility clearance needs Hidalgo County Health Department approval. With a septic system, the tank has to be installed and the septic report signed off by the county's OSSF department. The county provides the utility certificate application after the development permit is issued.

How much does a Hidalgo County manufactured home permit cost?

The Planning Department fee schedule lists $200 for a residential permit, $60 for utility certificates, $200 more for a property in a flood zone area, and $35 for each re-inspection. Building without a permit, where the work otherwise complies, adds a $100 penalty fee.

What setbacks apply to my lot in Hidalgo County?

The county says the recorded subdivision plat for your property shows the setbacks for your lot. The Planning Department can also provide a printout of the subdivision showing your property's dimensions, or you can hire a surveyor to find the corners.

Can an RV be used as a home in unincorporated Hidalgo County?

No. Since January 1, 2025, the Hidalgo County Planning Department no longer grants development permits or utility clearances for travel trailers, RVs or motor homes intended as primary residences.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Hidalgo County Planning Department
  2. Hidalgo County Planning, Residential Requirements for Construction
  3. Hidalgo County Planning, Requirements for Development Applications & Utility Certificates (2023)
  4. Hidalgo County Planning, Permitting and Development FAQ
  5. Hidalgo County Planning Department, Fee Schedule (effective January 1, 2025)
  6. TDHCA, Manufactured Housing installation records Installations reported in Hidalgo County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077