Hunt County, Texas

Manufactured home permits in Hunt County, Texas

Sources last checked

Hunt County does not issue certificates of occupancy or require building inspections, but a manufactured home placement outside city limits still goes through the Hunt County Health Department in Greenville. A $40 development permit is part of every septic permit package, and a lot with any floodplain needs it before a 911 address or septic permit. Every new driveway needs a culvert permit from the Commissioner's office.

manufactured homes installed in Hunt County in 2025 (TDHCA installation records)
256
Hunt County development permit; a residential septic permit is $335
$40
from Lake Tawakoni, inside which the Lake Tawakoni Zoning Ordinance applies
5,000 ft
Get a quote for Hunt County For dealers and installers

Who handles a placement in Hunt County?

For property outside city limits, the Hunt County Health Department issues development permits, septic permits and 911 addresses.

Health Department, Environmental Services, 2701 Johnson Street, Greenville, TX 75401. 903-408-4140.

Hunt County does not issue certificates of occupancy or require building inspections. The county’s own rules that still apply:

Rule What Hunt County says
Septic All septic systems must be permitted through the Health Department and installed by a Texas-licensed installer
Floodplain A lot with any amount of floodplain needs a development permit before it gets a 911 address or a septic permit
Driveway A culvert permit for every new driveway, from the Commissioner’s office
Zoning None, except within 5,000 ft of Lake Tawakoni, where the Lake Tawakoni Zoning Ordinance applies
Subdivision rules The Subdivision Regulations and Engineering Standards apply to all unincorporated property

A property inside Greenville, Commerce or another city follows that city’s rules.

What is the development permit?

A one-page application to the Health Department, $40, covering a new 911 address, new construction, a septic system or development in the floodplain. It asks for the owner’s details, the property ID, acreage and, in a subdivision, the subdivision, section, block and lot. The county’s floodplain administrator then marks whether the lot or the proposed development is in a flood hazard area or floodway.

If the property is in a floodplain, you also provide a copy of the plans for the proposed construction. An application expires one year from purchase if it is not processed.

What does the septic permit need?

Everything is turned in at the same time, and the owner signs every document:

Item Notes
Application Original form in the owner’s full name
911 address For the installation site
Development permit $40, from the Health Department
Deed Most current copy, with the County Clerk’s filing stamp
Survey plat Of the property
Metes and bounds Usually in the deed
Site evaluation and design Original, with the technical information sheet
Aerobic systems only Original affidavit from the office, maintenance contract signed by owner and installer, signed homeowner information form

The fee is $335 residential or $500 commercial. The Authorization to Construct is issued within 30 days if the paperwork is in order.

What does the state require in Hunt County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Hunt County works from the survey plat, the septic design and, in a floodplain, the construction plans. A site plan that puts the home, the septic system, the driveway culvert and any floodplain on the surveyed lot, with distances, keeps all three consistent. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does Hunt County require a permit for a manufactured home?

Hunt County does not issue certificates of occupancy or require building inspections. It does require a septic permit for every septic system, a culvert permit for every new driveway, and a development permit from the Hunt County Health Department, 2701 Johnson Street, Greenville, TX 75401 (903-408-4140). For a lot with any floodplain, the development permit comes before the 911 address or the septic permit.

What does a Hunt County septic (OSSF) permit need?

The Health Department's checklist asks for the application in the owner's full name, the 911 address for the site, a development permit ($40), the most current deed with the County Clerk's filing stamp, a survey plat, the metes and bounds, and the original site evaluation, design and technical information sheet. Aerobic systems also need an original affidavit from the office, a signed maintenance contract and a signed homeowner information form. Everything must be turned in at once.

How much does a Hunt County septic permit cost?

The checklist lists $335 for a residential septic permit and $500 for commercial, plus the $40 development permit. Paying by check or money order takes three separate checks: the septic permit, the development permit and the County Clerk's office.

How long does a Hunt County septic permit take?

The Health Department says the Authorization to Construct is issued once the application is reviewed and approved, within 30 days if all paperwork is in order. A development permit application expires one year from purchase if it is not processed.

Do I need a culvert permit for a driveway in Hunt County?

Yes. Hunt County requires culvert permits for all new driveways. They are issued by the Commissioner's office for the precinct.

Is there zoning in unincorporated Hunt County?

Not more than 5,000 feet from Lake Tawakoni. Within 5,000 feet of the Sabine River Authority property at Lake Tawakoni, the Lake Tawakoni Zoning Ordinance applies. The Hunt County Subdivision Regulations and Engineering Standards apply to all unincorporated property.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Hunt County Development Office, Hunt County Permitting & Zoning (effective May 20, 2022)
  2. Hunt County Health Department, Development Permit Application (revised November 1, 2025)
  3. Hunt County Health Department, How to obtain an Authorization to Construct for an on-site sewage facility (November 14, 2023)
  4. TDHCA, Manufactured Housing installation records Installations reported in Hunt County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077