Who issues the permit in Harrison County?
Two county offices handle a typical placement outside city limits:
| Office | Covers | Address | Phone |
|---|---|---|---|
| Harrison County Environmental Health | Septic (OSSF) permits | 2005 Warren Drive, Marshall, TX 75672 | 903-935-4870 ext. 1362 |
| Harrison County Road & Bridge | Floodplain development permits | 3800 Five Notch Rd., Marshall, TX 75672 | 903-935-4868 |
Road & Bridge is open 7:00 am to 3:30 pm, Monday to Friday. Property inside a city, such as Marshall, follows that city’s rules.
How does the septic permit work?
| Septic permit | Fee |
|---|---|
| Single-residence system | $360 |
| Proprietary or non-standard system | $360 |
| Commercial or multifamily system | $560 |
One permit is needed per system.
- Get the application.
- A qualified person does the mandatory site evaluation, with soil identification.
- Planning materials are prepared. Proprietary and non-standard systems need a registered sanitarian or professional engineer.
- Submit the complete application in the owner’s name with the fee, the planning materials, the site and soil evaluation, accurate directions to the site, a recorded affidavit for surface application systems, and a two-year service contract.
- On approval, the Authorization to Construct is issued, valid for one year.
- The system is inspected before it is covered. Call at least two working days ahead.
- A Notice of Approval follows within about 5 working days. A failed inspection costs half the permit fee to re-inspect.
The 10-acre rule lets an owner of one single-family home on 10 acres or more install their own system under TCEQ rules. If more than one home is placed on the property, Harrison County treats it as multifamily and a permit is required.
What does the floodplain permit need?
If the home is in a flood hazard area, usually land next to a lake, stream or creek, apply before placing it. The residential fee is $20. The packet includes:
- the Application to Develop in a Flood Hazard Area, signed by the owner
- a drawing to scale of the whole lot and the structures
- drawings of the structure showing the elevation design: a side profile with the structure, foundation and openings, the location and elevation of electrical and heating and air systems, and the anchoring method (which generally applies to manufactured homes)
- a FEMA elevation certificate by a professional engineer or land surveyor
- proof of ownership, such as a warranty deed or release of lien
- accurate directions to the site
A site inspection comes before construction, the permit follows in about 5 working days, and a final inspection closes it. Work in or over water, or that alters a watercourse, may also need a U.S. Army Corps of Engineers permit.
What does the state require in Harrison County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Harrison County’s floodplain permit asks for a drawing to scale of the whole lot and every structure, and the septic design depends on where the home and the system sit. Show the home, the septic system, the driveway, the property lines and the flood hazard boundary, with distances. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.