Who issues the permit in Freestone County?
For septic systems, Freestone County itself, as TCEQ’s authorized agent.
| Office | What it handles | Where | Phone |
|---|---|---|---|
| County Treasurer’s Office | Receives septic applications and fees | Room 102, Freestone County Courthouse, 118 E. Commerce St., Fairfield, TX 75840 | 903-389-2180 |
| County Services, OSSF | Septic review and inspections | Room 305, same courthouse | 903-389-8884 |
| Floodplain Administrator, Emergency Management | Floodplain development permits | Room 205, same courthouse | 903-390-8900 |
What does the septic application need?
- The application, with a 911 address and property description.
- An original site evaluation and soil analysis by a registered site evaluator or professional engineer.
- An original system design by a Certified Installer II, registered sanitarian or professional engineer.
- For aerobic and other secondary treatment systems, a recorded Affidavit to the Public filed with the deed, and a maintenance contract.
What are the septic fees and timing?
| Item | Freestone County (effective April 1, 2026) |
|---|---|
| Single-family residential | $310 |
| Commercial and other types | $510 |
| Re-inspection after a failed first inspection | Half the application fee, paid before each re-inspection |
| Returned check | $25 |
Pay Freestone County by cash, check or money order; credit cards are not accepted. The fee is non-refundable once the review is done.
- The county has up to five working days to approve or deny.
- If denied, the owner gets a letter and has one year from the application date to correct and resubmit the design.
- The Authorization to Construct is valid for one year. If the system is not installed in time, reapply and pay again.
- The installer books the final inspection, and a Notice of Approval is issued when the system passes.
Is a floodplain permit needed?
For construction in an identified flood hazard area, yes. The Floodplain Administrator issues a development permit for $25, and the form lists houses and manufactured homes. It asks for the subdivision, section, block and lot, or the survey and abstract, with a vicinity map. In a floodplain, include one copy of the plans and specifications. The permit is valid for one year and must be renewed if work is not finished.
What does the state require in Freestone County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design and any floodplain review depend on where the home sits. Show the home, the septic system and its field, any well, the driveway, the property lines and any part of the lot in a flood hazard area. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.