Who issues the permit in Leon County?
For property outside city limits, two county offices handle a manufactured home placement:
| Office | What it handles | Contact |
|---|---|---|
| Leon County 911 Addressing/EOC Office | 911 address, floodplain determination permit, electric permit | 155 N. Cass, 3rd Floor, Centerville, TX 75833. 903-536-3158 |
| Leon County OSSF Compliance Program | Septic (OSSF) permits | 2212 CR 282, Buffalo, TX 75831. 903-322-3101 |
The 911 Addressing Office is open Monday to Thursday 8:00 am to 5:00 pm and Friday 8:00 am to noon. It processes no electric permits after 4:00 pm. Forms can be emailed, faxed or brought in, and the floodplain and electric fees can be paid online.
Verify the 911 physical address first. Both the floodplain and electric permit pages ask for it before anything else.
What does the floodplain permit need?
| Outside a flood hazard area | In a Special Flood Hazard Area or floodway | |
|---|---|---|
| What is required | Floodplain determination permit | Floodplain determination, development permit, authorization to proceed letter and elevation certificate |
| Fee | $20, due at application | $420 |
The application asks for the owner, the contractor, any engineer, the 911 address and the date construction will begin. No work may start until the determination permit or the authorization to proceed letter is issued, and the permit expires one year from its date. The determination covers only the county’s Flood Damage Prevention Order; other permits may still apply.
What is the electric permit?
Leon County’s electric permit is a 911 verification and release for the power company:
- It costs $30, separate from anything the electric provider charges.
- It is required only in unincorporated areas. Inside city limits it is not needed.
- After the 911 Addressing Office processes it, the office forwards it to the electric provider named on the permit.
What about septic?
Where there is no public sewer, the septic (OSSF) permit comes from the Leon County OSSF Compliance Program. Original documents go to its representative in Buffalo. The county posts a how-to-obtain-a-permit guide (effective August 1, 2022) and two affidavits to the public: one for surface irrigation systems and one for a system that ties two or more tracts together.
What does the state require in Leon County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The floodplain determination and the septic design both depend on where the home sits. Show the home, the septic system and its field, any well, the driveway, the property lines and any part of the lot in a mapped flood zone. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.