Who issues the permit in Cooke County?
For septic systems, the Cooke County OSSF inspector. 940-372-0487, Monday to Friday, 8 am to 5 pm.
All forms must be county or TCEQ approved. No physical part of a system may be installed until the county confirms approval.
What does the septic application need?
| Item | Conventional | Aerobic |
|---|---|---|
| Application with the 911 address and legal description | Yes | Yes |
| Site and soil evaluation by an engineer, sanitarian or licensed site evaluator | Yes | Yes |
| System design by an engineer, sanitarian or licensed installer, approved by the county | Yes | Yes |
| Copy of the plat or land survey with the legal description and lot size | Yes | Yes |
| Signed service contract with a licensed maintenance provider | Yes | |
| Certified copy of the notarized Affidavit to the Public, filed with the County Clerk | Yes | |
| Fee (2026) | $410 residential, $560 commercial or multi-unit | $510 |
Pay by cash, check or money order. The County Clerk does not offer notary services.
How long does it take?
- The county approves or denies within 30 days of receiving everything.
- Problem resolution can take up to another 30 days. A denial comes in writing.
- The applicant is responsible for checking on status.
- The system is inspected after installation and before it is covered. The contractor records the system on the county’s as-built design form.
What does the state require in Cooke County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic application includes the plat or survey with the lot size, and the design depends on where the home, the system and its field, any well and the property lines sit. Show them with distances. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.