Coleman County, Texas

Manufactured home permits in Coleman County, Texas

Sources last checked

In Coleman County, septic (OSSF) permits go through the county's designated representative (325-660-9116). The fee is $375 for a single-family residence, by check payable to Coleman County. The ten-acre rule is in effect. All four pages of the application must be filled in, with a legal description and a drawing; an application with 'see attached' or 'see design' in any blank is sent back.

manufactured homes installed in Coleman County in 2025 (TDHCA installation records)
35
Coleman County septic (OSSF) permit, single-family or any other facility (application dated October 15, 2026)
$375
in effect in Coleman County
Ten-acre rule
Get a quote for Coleman County For dealers and installers

Who issues the permit in Coleman County?

Coleman County’s septic (OSSF) program is run by a designated representative under contract to the county:

Office Where Phone
Coleman County OSSF designated representative Merkel (mailing address on the application) 325-660-9116
Coleman County Courthouse (blank applications) 100 W. Live Oak Street, Coleman, TX 76834

Property inside Coleman or Santa Anna may follow the city’s rules instead. Check with the city first.

What does the septic permit cost?

The county’s application dated October 15, 2026:

Facility Fee
Single-family residence $375
All other facilities (commercial, multi-unit residential) $375

Pay by check to Coleman County, mailed with the application. The ten-acre rule is in effect in Coleman County.

What does the application need?

  • All four pages filled in. Do not write “see attached” or “see design” in any blank on pages 1 and 2. The application is sent back and the Authorization to Construct is not issued.
  • The technical information page completed, even if the design repeats it. Site evaluators and engineers may use their own site evaluation forms.
  • A legal description. The appraisal district’s CAD card for the property has the information needed.
  • A site evaluation by a licensed site evaluator or engineer, documenting soil and site conditions under 30 TAC 285.30 and 285.31.
  • Planning materials. Standard systems may be prepared by the owner or installer; non-standard and proprietary systems need a licensed professional engineer or registered sanitarian.
  • Two copies of the site evaluation, the planning materials and the directions to the site, plus a recorded affidavit and signed maintenance contract where required.
  • A respectable drawing.

What happens after approval?

A written Authorization to Construct is mailed in the owner’s name, valid for one year. The installer must notify the designated representative at least five working days before the final construction inspection, and all excavations stay open until the inspection is done.

What does the state require in Coleman County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Coleman County returns septic applications that lean on “see attached”, so the drawing has to stand on its own. A site plan should show the property lines and acreage, the home, the septic tank and drain field with their distances, any water well, and the driveway. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits for a manufactured home in Coleman County, Texas?

The Coleman County OSSF designated representative, based in Merkel (325-660-9116). Applications and the fee are mailed to the designated representative's address on the county's application. Blank applications are also available at the Coleman County Courthouse, 100 W. Live Oak Street, Coleman.

How much is a Coleman County septic permit?

$375 for a single-family residence, and $375 for all other types of facilities, by check payable to Coleman County, according to the county's application dated October 15, 2026.

Does a manufactured home on 10 acres need a septic permit in Coleman County?

The county's application says the ten-acre rule is in effect in Coleman County. Under the state rule, a single-family residence on 10 acres or more may be exempt from the permit if the system meets the setback and no-nuisance conditions. Confirm with the designated representative before relying on it.

Why would Coleman County send a septic application back?

If any page is incomplete, or any blank on pages 1 and 2 says 'see attached' or 'see design'. All four pages must be filled out, the technical information page must be completed even if the design repeats it, the legal description is required (the appraisal district's CAD card has it), and a drawing must be included.

How long does a Coleman County septic permit take?

On approval, a written Authorization to Construct is mailed in the owner's name and is valid for one year. The installer must give at least five working days' notice before the final construction inspection, and excavations stay open until the inspection is done.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 24, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Coleman County Commissioners Court page (septic information and designated representative)
  2. Coleman County OSSF Permit Application (Septic Tank Inspection), October 15, 2026
  3. TDHCA, Manufactured Housing installation records Installations reported in Coleman County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077