Who issues the permit in Liberty County?
For property outside city limits, the Liberty County Permit & Inspection Department issues building, septic, culvert and floodplain permits. It has two offices:
| Office | Address | Phone |
|---|---|---|
| Liberty | 311 Travis Street, Liberty, TX 77575 | 936-336-4560 |
| Cleveland | 1616 County Road 3549, Cleveland, TX 77327 | 832-579-1135 |
Hours are 8:00 am to 4:00 pm, Monday to Friday. Applications can also be made through the county’s online permit portal.
Property inside a city, such as Liberty, Cleveland or Dayton, may follow that city’s rules instead. Check with the city before applying to the county.
Start with the permit, not the work. A county notice approved June 9, 2026 says any work started or completed without the required permit (building, culvert, meter and others) pays double the permit fees. Permits must be posted and visible.
What does the building permit need?
Liberty County requires a building permit for any building of 100 square feet or more built or moved onto a property, and its guide names manufactured homes. What you provide depends on the flood zone:
| Item | Outside the floodplain | Inside the floodplain | Inside the floodway |
|---|---|---|---|
| Septic proof: the Liberty County Septic Verification Report from a Texas licensed installer or engineer, or a septic permit for a new system | Yes | Yes | Yes |
| Legal description (with property ID number or 911 letter) | Yes | Yes | Yes |
| Square footage of the home | Yes | Yes | Yes |
| Year and model of the home | Yes | Yes | Yes |
| Number of bedrooms | Yes | Yes | Yes |
| Estimated value | Yes | Yes | Yes |
| Elevation certificate (from a licensed surveyor or engineer) | Yes | Yes | |
| No-rise certificate (from a licensed engineer) | Yes | ||
| Permit fee | $125 | $125 plus $0.15 per sq ft of living space | $125 plus $0.15 per sq ft of living space |
The septic step comes first: the county will not issue the building permit until the septic system is proven or a septic permit is bought.
What does a septic (OSSF) permit need?
All systems must be installed to TCEQ’s Chapter 285 rules. The county says to start with a Texas-licensed septic installer, site evaluator, registered sanitarian or engineer, who can prepare the paperwork. Every application needs:
- a site evaluation by a licensed site evaluator or engineer
- a drawing of the system layout and design by a registered sanitarian or engineer
- a signed two-year maintenance agreement
- an Affidavit to the Public, signed, notarized and recorded at the County Clerk’s office
The septic permit fee in the August 2025 guide is $275.
What are the culvert and driveway rules?
A Commissioners Court resolution of August 9, 2022 says every culvert installation needs a permit from the county permitting department:
- Residential driveways on public right-of-way must be at least 20 feet wide and installed before the lot is developed.
- A residential culvert can be at most 28 feet long.
- The culvert must be sized by the county Engineering Department or the precinct commissioner before installation.
- Culverts are corrugated polyethylene dual-wall pipe, bedded on 12 inches of stabilized sand, limestone road base or crushed concrete, with at least 8 inches of cover.
- Owners may install their own culvert, with a permit and the precinct commissioner’s approval.
- Unpermitted or non-compliant culverts can be removed, and non-compliance is a Class C misdemeanor with a fine of up to $250 a day.
In Precincts 3 and 4, culvert installation and inspection must be done within 90 days of buying the permit. After that the permit is renewed for $75, and a failed inspection costs $50 to re-inspect.
What does the state require in Liberty County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Liberty County’s building permit is light on drawings, but the septic design and the floodplain certificates depend on where the home, the septic system, the driveway culvert and the flood zone boundary sit on the lot. A site plan that shows all four, with property lines and distances, keeps the septic designer, the surveyor and the county working from the same layout. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.