Tom Green County, Texas

Manufactured home permits in Tom Green County, Texas

Sources last checked

In unincorporated Tom Green County, Tom Green County Environmental Health in San Angelo issues septic (OSSF) permits under the county's OSSF ordinance and regulates new development in mapped floodplains, including how high new construction must be elevated. A driveway permit on a county road is applied for at the County Clerk's Real Estate Section; the precinct commissioner or road superintendent responds within 3 working days.

manufactured homes installed in Tom Green County in 2025 (TDHCA installation records)
80
for the commissioner or road superintendent to contact you about a Tom Green County driveway permit
3 working days
validity of a Tom Green County driveway permit
1 year
Get a quote for Tom Green County For dealers and installers

Who issues the permits in Tom Green County?

Outside city limits, Tom Green County Environmental Health issues septic permits and regulates floodplain development.

Office Address Phone
Environmental Health Edd B. Keyes Building, 1st Floor, 113 W. Beauregard Ave., San Angelo, TX 76903 325-658-1038

Property inside San Angelo or another city may follow the city’s rules instead. Check with the city first.

Septic (OSSF) permits

Environmental Health enforces the TCEQ septic rules under a county OSSF ordinance, issuing permits and inspecting systems. Its stated aim is a system sized for the soil with all the right components. The county posts a septic permit application, an affidavit for systems requiring maintenance, and an affidavit for multiple small lots.

Floodplain permits

Tom Green County is in the National Flood Insurance Program. Environmental Health regulates new development and substantial improvements in the mapped floodplains, keeps the flood maps, and decides how high new construction must be elevated. The county also posts the 2016 Lake Creek flood study.

Driveway permits on county roads

  1. Get the application online or from the County Clerk’s Real Estate Section.
  2. Return it there and pay the fee.
  3. The Real Estate Section sends it to the precinct commissioner and road superintendent.
  4. They contact you within 3 working days, and sign the application once construction is approved.
  5. The permit is valid for one year from the date of application or approval, whichever comes first.

What does the state require in Tom Green County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

In Tom Green County the septic design, the floodplain elevation decision and the driveway approval all depend on the layout. A site plan should show the property lines, the home against any mapped floodplain, the septic tank and drain field, any water well, and the driveway where it meets the county road. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits for a manufactured home in Tom Green County, Texas?

Tom Green County Environmental Health, Edd B. Keyes Building, 1st Floor, 113 W. Beauregard Ave., San Angelo (325-658-1038). It enforces the TCEQ septic rules under a county OSSF ordinance, issues permits and inspects systems.

Does Tom Green County require a floodplain permit?

For new development in the regulated, mapped floodplains, yes. Tom Green County is in the National Flood Insurance Program, and Environmental Health keeps the flood maps and decides how high new construction must be elevated.

How do I get a driveway permit in Tom Green County?

Get the application online or from the County Clerk's Real Estate Section, return it there and pay the fee. The Real Estate Section sends it to the precinct commissioner and road superintendent, who contact you within 3 working days and sign it once construction is approved. The permit is valid for one year from the date of application or approval, whichever comes first.

Does Environmental Health review lot sizes in Tom Green County?

Yes, for subdivisions. Environmental Health reviews lot sizes and locations for septic systems and floodplain issues, under the Local Government Code and TCEQ Chapter 285. The county's subdivision regulations were amended in 2024.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 24, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Tom Green County Environmental Health
  2. Tom Green County, Procedures for County Driveway Permits
  3. Tom Green County, Septic Permit application
  4. TDHCA, Manufactured Housing installation records Installations reported in Tom Green County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077