Who issues the permit in Van Zandt County?
For septic systems, the Van Zandt County Fire Marshal’s office, which has TCEQ designated representatives on staff.
Fire Marshal’s Office, 24634 State Highway 64, Canton, TX 75103. 903-567-6026. Monday to Friday, 8 am to noon and 1 to 4:30 pm. Paperwork can be left in the drop box by the door.
What lot size is needed?
The minimum lot is 1 acre. Lots under 1 acre must provide a variance with the date of the plat. Irregular or undersized lots, substantial variances and unconventional designs need supporting documents, submitted with the application.
What does the septic application need?
All fields must be completed; the property ID, GEO number and precinct come from the Van Zandt County appraisal district.
- site evaluation report with original signature, date and seal
- technical information sheet
- complete scaled design with the original signature of a registered sanitarian or engineer
- warranty deed
- two-year maintenance contract and affidavit filed with the County Clerk (not needed for conventional or LPD systems)
- any variance
More than one residence on the property? Add:
- a letter of familial relation
- a letter from ETCOG with the new 911 address
- a letter from the water company establishing a separate meter
| Fee | Amount |
|---|---|
| Single-family residence | $400 |
| Commercial or multifamily | $650 |
| Re-inspection | $200 |
| Annual maintenance contract filing | $30 a year |
Check or money order only; non-refundable.
What must the drawing show?
A professional-quality scaled drawing. Drawings missing any of these are not accepted:
- north arrow, adjacent streets, and the legal description and survey
- slope direction and percentage
- property lines, building setbacks and utility easements
- any floodplain
- all proposed structures, labeled with square footage
- drainage ways, ponds, cut or fill banks
- all existing or proposed water wells
- numbered soil borings and pits, with distances from the property line
- distances from the system to all improvements and to the nearest property lines
- radius of spray areas
- designer’s signature and seal
How long does it take?
The county approves or denies within 30 days, and emails the Authorization to Construct or denial to the installer. Request the final inspection by email five days before installation. The Approval to Operate is emailed within seven business days of passing.
What does the state require in Van Zandt County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Van Zandt County’s septic drawing is one of the most detailed in Texas: the home labeled with its square footage, setbacks, easements, slopes, wells, drainage and distances to every improvement. Stampd draws site plans for manufactured home placements to this checklist.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.