Who issues the permit in Denton County?
For property outside city limits, Denton County Development Services issues development permits. The county defines development as any man-made change to improved or unimproved real estate, including buildings and other structures, filling, grading, paving and excavation.
Development Services, 3900 Morse Street, Denton, TX 76208. 940-349-2990.
| Permit | When | Who |
|---|---|---|
| Development permit | Any development; one for each structure built or placed on a lot | Development Services |
| Culvert permit | Any new drive on a county-maintained road, or new development with an existing drive | Development Services |
| Septic (OSSF) permit | Where a septic system is needed | Denton County Public Health, Environmental Health, 940-349-2920 |
| Construction permit | Commercial development only | Denton County Fire Marshal |
Cities such as Denton and Lewisville run their own permits. Around Lake Ray Roberts, the county also enforces a land use ordinance with zoning.
What does the application need?
- an Application for Development Permit with the owner’s name and address
- the property description: abstract, tract number and acreage, or subdivision name, lot and block
- a site plan showing proposed and existing improvements and their distance to at least two property lines, including any existing septic systems
- any other required documents
Applications go through the county’s Civic Access portal, or in person, by mail or by email to Development Services. Incomplete packages are rejected and must be resubmitted. Fees are not paid at submittal: the county emails the fee and a tracking number once the package is complete, and the tracking number must go on the payment.
The order of steps
- Apply for the development permit for each structure.
- If it complies, the county issues the permit with copies of the floodplain, abstract and plat maps.
- In a FEMA Special Flood Hazard Area, a post-construction finished floor elevation certification by a Texas registered surveyor, engineer or architect confirms the floor is at or above the elevation in the elevation certificate.
- Apply for the septic system with Environmental Health, with a copy of the development permit and application, the floodplain map, the abstract or plat map, and any elevation and finished floor certifications.
- Build the septic system, request the county inspection, and receive the license to operate.
What does the state require in Denton County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Denton County’s rule is specific: every proposed and existing improvement, with its distance to at least two property lines, and any existing septic system. Because the septic application reuses the development permit, show the planned septic area and any floodplain boundary too. Stampd draws site plans for manufactured home placements.
More help with Texas placements