Denton County, Texas

Manufactured home permits in Denton County, Texas

Sources last checked

Any development in unincorporated Denton County, including placing a manufactured home, needs a development permit from Denton County Development Services in Denton. The application needs the property description and a site plan showing proposed and existing improvements with distances to at least two property lines and any existing septic system. A culvert permit and a septic permit may also be needed.

manufactured homes installed in Denton County in 2025 (TDHCA installation records)
160
property lines, at least, that the Denton County site plan must measure each improvement from
2
Denton County development permit for each structure built or placed on a lot
1 per structure
Get a quote for Denton County For dealers and installers

Who issues the permit in Denton County?

For property outside city limits, Denton County Development Services issues development permits. The county defines development as any man-made change to improved or unimproved real estate, including buildings and other structures, filling, grading, paving and excavation.

Development Services, 3900 Morse Street, Denton, TX 76208. 940-349-2990.

Permit When Who
Development permit Any development; one for each structure built or placed on a lot Development Services
Culvert permit Any new drive on a county-maintained road, or new development with an existing drive Development Services
Septic (OSSF) permit Where a septic system is needed Denton County Public Health, Environmental Health, 940-349-2920
Construction permit Commercial development only Denton County Fire Marshal

Cities such as Denton and Lewisville run their own permits. Around Lake Ray Roberts, the county also enforces a land use ordinance with zoning.

What does the application need?

  • an Application for Development Permit with the owner’s name and address
  • the property description: abstract, tract number and acreage, or subdivision name, lot and block
  • a site plan showing proposed and existing improvements and their distance to at least two property lines, including any existing septic systems
  • any other required documents

Applications go through the county’s Civic Access portal, or in person, by mail or by email to Development Services. Incomplete packages are rejected and must be resubmitted. Fees are not paid at submittal: the county emails the fee and a tracking number once the package is complete, and the tracking number must go on the payment.

The order of steps

  1. Apply for the development permit for each structure.
  2. If it complies, the county issues the permit with copies of the floodplain, abstract and plat maps.
  3. In a FEMA Special Flood Hazard Area, a post-construction finished floor elevation certification by a Texas registered surveyor, engineer or architect confirms the floor is at or above the elevation in the elevation certificate.
  4. Apply for the septic system with Environmental Health, with a copy of the development permit and application, the floodplain map, the abstract or plat map, and any elevation and finished floor certifications.
  5. Build the septic system, request the county inspection, and receive the license to operate.

What does the state require in Denton County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Denton County’s rule is specific: every proposed and existing improvement, with its distance to at least two property lines, and any existing septic system. Because the septic application reuses the development permit, show the planned septic area and any floodplain boundary too. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Denton County, Texas?

Yes. Denton County says any development in unincorporated Denton County requires a development permit from Development Services, and development includes buildings and other structures. Each lot owner applies for a development permit for each structure to be built or placed on the lot. Development Services is at 3900 Morse Street, Denton, TX 76208 (940-349-2990).

What does a Denton County development permit application need?

An Application for Development Permit with the owner's name and address; the property description (abstract, tract number and acreage, or subdivision name, lot and block); and a site plan showing proposed and existing improvements and their distance to at least two property lines, including any existing septic systems. Applications are made through the county's Civic Access portal.

What happens to incomplete applications in Denton County?

They are rejected. Denton County reviews each permit packet for completeness first; missing documents, missing information or illegible writing means the package must be resubmitted. Fees are not paid at submittal: once the package is complete, the county emails the fee with a tracking number that must go on the payment.

What if the home is in a floodplain in Denton County?

If the structure is in a FEMA Special Flood Hazard Area, the applicant must submit a post-construction finished floor elevation certification by a Texas registered surveyor, engineer or architect, confirming the finished floor is at or above the elevation in the elevation certificate.

How does the septic permit work in Denton County?

After the development permit, the owner applies to build the septic (private sewage) system with Denton County Public Health, Environmental Health (940-349-2920), including a copy of the development permit and application, the floodplain map, the abstract or plat map, and any elevation certificate and finished floor certification. After construction, the county inspects and issues a license to operate.

Is a culvert permit needed in Denton County?

Yes, for any new drive on a county-maintained road, or for new development with an existing drive.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Denton County Development Services
  2. Denton County, Applying for Development Permits
  3. TDHCA, Manufactured Housing installation records Installations reported in Denton County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077