Who issues the permit in Jefferson County?
For unincorporated property, Jefferson County Environmental Control handles development permits, septic permits and power release.
Environmental Control, 7933 Viterbo Road, Suite 4, Beaumont, TX 77705. 409-719-5910. Monday to Friday, 8 am to noon and 1 to 5 pm.
If the property has no address yet, get one from Regional Planning: 409-724-1911.
What does the development permit need?
Contact Environmental Control before any development. The application lists manufactured homes and RVs. No work of any kind may start until the permit is issued.
- a site plan showing all existing structures, water bodies, adjacent roads, lot dimensions and the proposed development
- development plans drawn to scale, with anchoring details and the proposed lowest floor elevation where they apply
- the project address, appraisal district property ID, lot, block, acreage and subdivision
- whether the property fronts a county road
Permits are usually issued in 5 to 10 business days and stay active for one year from purchase. A permit expires if no work starts within a year of issue, and it is not issued until other required permits are in. Fees are non-refundable.
What changes in a flood zone?
After the application is in, Environmental Control determines the flood zone, which sets how high the home must be built. In an A zone, provide a finished elevation certificate.
How is power released?
- Temporary power: once the permit is issued, give Environmental Control the Entergy account number and account name.
- Permanent power: after all required paperwork is turned in, with the same Entergy details.
What does the septic permit need?
All new septic systems must be permitted before construction. Start with a Texas-licensed installer. The application needs:
- a site plan, site evaluation and soil analysis from a professional engineer or sanitarian
- the legal description: subdivision, street, unit, lot and block, or abstract and tract
- a map or directions to the property
- the number of bedrooms and living area
- a signed two-year maintenance contract
- a recorded Affidavit to the Public
Call at least the day before the final inspection. After it passes, the owner receives a New Installation Certificate.
What does the state require in Jefferson County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Jefferson County’s development permit asks for a site plan with existing structures, water bodies, adjacent roads, lot dimensions and the proposed home, and the septic permit needs its own site plan. Add the septic system, any well, the driveway and the flood zone. Stampd draws site plans for manufactured home placements.