Who issues the permit in Bandera County?
Bandera County issues development permits and septic (OSSF) permits for unincorporated property. Confirm the current office and phone before applying; the county website recently moved.
Step 1: the 911 address
The development permit application says a 911 address must be assigned before it can proceed.
Step 2: the development permit
The application (revised January 8, 2025) lists manufactured homes. It asks for:
- the 911 site address
- the subdivision, unit, section, block and lot, or the survey, abstract and acreage
- an area map or survey and a copy of the deed
- the type of development and whether it is new construction or a manufactured home
- the water source (private well or public) and sewage (septic or public)
- in a flood hazard area, one copy of the plans and specifications
- in a floodway, a no-rise letter signed and sealed by a licensed professional engineer
If a permit is for an RV only and a permanent structure later replaces it, a new development permit is required.
What are the fees?
| Item | Fee (revised February 2024) |
|---|---|
| Residential development permit application | $50 |
| Residential septic, non-aerobic, under 500 gallons a day | $210 |
| Residential septic, aerobic or over 500 gallons a day | $400 |
| Commercial septic | $400 |
| Septic modification | $210 |
| Septic re-inspection | $45 |
| Manufactured home rental community Infrastructure Development Plan | $100 plus $10 per rental space |
What changes in a flood zone?
If the property is in the special flood hazard area, the county requires a final foundation elevation certificate before it issues the License to Operate for the septic system. The floodplain permit does not override deed restrictions or subdivision rules.
What does the state require in Bandera County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The development permit asks for an area map or survey, and the floodplain review depends on where the home sits. Show the home, the septic system and its field, any well, the driveway, the property lines and any flood hazard area. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.