Who issues the permit in Gillespie County?
Outside the Fredericksburg city limits, offices at the Gillespie County Courthouse, 101 West Main Street, Fredericksburg, TX 78624:
| What | Office | Phone |
|---|---|---|
| Development determination, floodplain, development permit | Gillespie County Engineer (Floodplain Administrator) | 830-307-6196 |
| Septic (OSSF) permit | Sanitation Department, Room B-101 | 830-997-8191 |
| 911 rural address | Rural 9-1-1 Addressing, Room B-101 | 830-997-1726 |
| Driveway on a county road | County commissioner or County Engineer | 830-997-7503 or 830-307-6196 |
| Driveway on a state highway | TxDOT Fredericksburg office | 830-997-4361 |
Step 1: the Development Determination Form
Before developing the property, submit the free Development Determination Form to the County Engineer. It lists manufactured homes, and it must include a site plan and narrative of all existing and proposed development.
From it, the Floodplain Administrator records:
- whether any part of the property is in the special flood hazard area
- whether any proposed development is within 100 feet of it
- whether impervious cover is 40% or more
- which county permits apply: development permit, right-of-way permit, rental community application or subdivision plat
- whether the project is released to the septic department
Any change to the site plan voids the determination.
What should the site plan include?
The county’s example site plan says, at a minimum:
- property lines and acreage
- all existing structures, porches and driveways
- all proposed structures, porches and driveways
- proposed site work: grading, fill or excavation
Add a short narrative, for example: “placement of a manufactured home, driveway and septic system on a 10-acre lot with an existing barn; fill for the home pad.”
Step 2: the development permit, if required
| Fee | Amount |
|---|---|
| Administrative fee | $100, paid with the application |
| Third-party engineering review | Actual cost, paid before approval |
| Construction started before approval | Fee doubled |
Notify the Floodplain Administrator when construction is complete for a final inspection and as-built documents.
Step 3: the septic permit
Gillespie County requires approved wastewater disposal in all areas, regardless of acreage. Since August 1, 2025, a septic application is not complete until the Development Determination Form is signed.
| Permit | Fee (effective October 14, 2025) |
|---|---|
| New or upgraded, under 500 gallons a day | $325 |
| New or upgraded, needing a maintenance contract | $425 |
| 500 gallons a day or more | $550, or $750 with a maintenance contract |
| Repair or alteration | $200 |
| Re-inspection | $150 |
What does the state require in Gillespie County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Gillespie County’s whole process starts from the site plan, and it must show the entire property with everything existing and proposed. Add the septic system and its field, any well and the flood zone. Stampd draws site plans for manufactured home placements to the county’s example.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.