Collin County, Texas

Manufactured home permits in Collin County, Texas

Sources last checked

Collin County requires a permit for any residential project outside city limits that disturbs ground or adds footprint, applied for through the county's Citizen Self-Service Portal. Where a new septic system is needed, apply for the development permit first and the county adds the septic (OSSF) permit to it. Properties in a city's ETJ still permit through the county, with an ETJ verification form signed by the city.

manufactured homes installed in Collin County in 2025 (TDHCA installation records)
131
minimum to use a septic system on a Collin County lot divided in 2008 or later; 1.5 acres with a water well
1 usable acre
of no activity before a Collin County septic permit expires
365 days
Get a quote for Collin County For dealers and installers

Who issues the permit in Collin County?

For property outside city limits, Collin County Development Services issues the permits, through the county’s Citizen Self-Service Portal. The county says any residential project that disturbs ground or adds footprint on a parcel needs a permit.

Where the property is Who permits
Unincorporated Collin County Collin County
A city’s ETJ Collin County, with an ETJ Verification form signed by the city
Inside a city That city. For septic, check TCEQ’s list of authorized agents; if the city is not listed, Collin County is the agent

There is no county zoning outside city limits, apart from sexually oriented businesses, salvage and junk yards, and animal slaughter operations. Use the county’s interactive map to check whether a parcel is in a city, an ETJ or the floodplain. The Fire Marshal’s Office is the cashier for all permits. Culverts, driveways and right-of-way go through Public Works.

How do the development and septic permits fit together?

  • If the home connects to a new septic system, apply for the development permit first. County staff then send the associated septic (OSSF) permit through your portal.
  • Do not apply for a separate development permit and septic permit.
  • Adding a structure on a property with an existing septic system needs a review of the existing system.
  • Collin County applies the state Chapter 285 rules plus its own stricter court order.
  • Systems that require maintenance need an affidavit filed with the County Clerk (2300 Bloomdale Rd., Suite 2104, McKinney).
  • A septic permit expires after 365 days of no activity.

What is the minimum lot size for septic?

When the lot was divided Minimum
Before 1983 Existing small lots may be allowed with proof the lot existed then and a compliant design
1983 to 2008 1 acre, or 1.5 acres with a water well
2008 or later 1 usable acre, or 1.5 acres with 1 usable acre if there is a water well

“Usable” means usable for the septic components and disposal area, excluding most easements and ponds. A lot made smaller than required after these dates is ineligible for septic, except where land was taken by a government for a road.

Addressing and power

  • Collin County does not address raw land. The address is assigned during permitting. Mark the home’s location correctly on the site map or addressing is delayed.
  • Meter releases are requested electronically with the permit number and full address.
  • Permanent power needs a passing third-party electrical inspection, and the septic system must have passed both its initial and final inspections.
  • Releases are approved or denied within three business days.

What does the state require in Collin County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Collin County assigns the address from the location marked on the site map, and the septic review depends on the usable acreage once easements and ponds are excluded. Show the home, the septic system and disposal area, any well, easements, ponds, the driveway and the property lines, with distances. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Collin County, Texas?

Yes. Collin County says permitting is required for residential and non-residential projects that disturb ground or add footprint on a parcel in the unincorporated county, and every such project must apply through the Collin County Citizen Self-Service Portal. There is no county zoning outside city limits apart from a few business uses.

What if the property is in a city's ETJ in Collin County?

ETJ properties are still in the county and permit through the county. For new construction in an ETJ, Collin County requires an ETJ Verification form signed by the ETJ city, showing the planned construction complies with the city's subdivision regulations.

How does the septic permit work in Collin County?

For a new structure connecting to a new septic system, apply for the development permit first; county staff then send the associated OSSF permit through your portal. Do not apply for a separate development permit and OSSF permit. Collin County follows the state Chapter 285 rules plus its own stricter court order, and systems requiring maintenance need an affidavit filed with the County Clerk.

What is the minimum lot size for a septic system in Collin County?

A lot divided between 1983 and 2008 must start with at least 1 acre, or 1.5 acres with a water well. A lot divided in 2008 or later must start with 1 usable acre, or 1.5 acres with 1 usable acre if there is a water well. 'Usable' excludes most easements and ponds. A lot made smaller than required after those dates is ineligible for a septic system.

How do you get an address in Collin County?

Collin County does not address raw land. Addresses are assigned as part of the permitting process. Applying without an address means selecting the parcel, and addressing can be delayed if the structure's location is not marked correctly on the site map.

When is permanent power released in Collin County?

Meter releases are requested electronically with the permit number and full address. Permanent power needs a passing third-party electrical inspection, and where there is a septic system it must have passed both the initial and final inspections. Releases are approved or denied within three business days.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Collin County Development Services, Frequently Asked Questions
  2. Collin County Development Services, On-Site Sewage Facilities
  3. TDHCA, Manufactured Housing installation records Installations reported in Collin County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077